About KASHIF QAISER

Education

Experience

  • 2019 - Present
    Ericsson

    Senior Project Engineer

    PROJECT: STC FTTH Project  Conduct site surveys for planning of new FTTH network and Pre project discussion and coordination with STC & Contractors.  Submitting project work order with drawings, cost estimate and other documents to the management for approval.  Calculated risks during project development and managed risks throughout projects.  Coordinated project team of 5 engineers, 2 designers and 2 surveyors for FTTH projects in commercial and industrial development.  Prepare Point to point connectivity solutions including plan, design, drawings, BOQ Coordinate with various departments to ensure that required materials and resources are delivered and available on time.  Monitor day to day progress on contractors work for Installation & Implementation of FTTH networks (civil & cable jobs up to drop fiber, fiber termination, installation of FDT etc.) for maintaining quality of service & STC standards.  Carry out site inspection in coordination with Clients & consultants to ensure projects deliverables are carried out according to the design and with agreed level of quality.  Validate & prepare any amendment\'s required to original design and Inspect and validate the optical budget of each feeder area.  Submit detail implementation schedule along with any variation expected to initial Bill of Quantity (BOQ).  Check that the received as-built drawings are aligned with the original plans and the issued amendments and preparing Red line drawing.  Supervise the designer updating OSP data using NE Tool for STC.  Attend any queries from the vendor/contractor team. Giving feedback to the contractors on project progress and issues on site.  Perform PAT with STC Handover Teams through inspection as per guidelines of STC.  Performance test of fiber network using OTDR, Power meter etc. and resolve all testing issues like high loss, no signal etc.  Create and updating the GT (granite) and Verifications of ODF design including Port/ODF allocation, Check and validate FTTH main feeder routes, Splitter boundaries and Distribution Cable Routing.  Variation in design updated in NE tool and submitted for approval.  Perform work order close with joint visit with consultant in PMCS/eQAIT and scanning all QR for material , installed length of fiber cable and installed OSB/ODB/FTB, joint estimation of all material installed in site as per design.  Following invoice through NFTS.

  • 2017 - 2019
    Ericsson

    Regional Project Lead Engineer

    PROJECT: IPND Stage 3 SANGCOM PROJECT  Manage all Fiber Optic Construction including outside plant, scope, and financial associated with the project of Eastern Region.  Establishing Scope of work, identifying milestones and project completion dates.  Provided technical leadership for company to effectively steer strategic plans and future projects.  Completed daily construction tasks while providing safe working conditions, staying on budget and meeting project deadlines.  Continuous communication with delivery to ensure work on track and issues are identified, resolved and addressed immediately.  Key responsible person, handling project consultant: Atkins, Project Management: Faithful & Gould and client GPT Special Project Team.  Managing contractors, completely ensure that work has been done according to specification and related SOW/standards and process for material approval if required.  Conduct regular site visits and inspection of the installation for ensuring concurrence with the documents.  Raise the TQ (Technical Query) if require and preparing the technical Submittals Briefing to contractors and highlight issue any design, safety and contractual inconsistency.  Preparing documents and submitted to concern authority for extracting permits.  Every week perform presentation on current progress and share future look up plan to all stakeholders.  Monitor the progress of the work .Review the corrective actions proposed by the contractor, follow up and finalize out the procedure.  Monitored installation of materials and equipment for compliance with drawings and specifications and focusing DPR, DLR and DER for sites.  Attending meetings with clients, show our capabilities and professionalism and maintain good reputation for increase business from clients.  Precise the contractors work \As-Built\ drawings reflecting in details the as-built and approve the As-Built drawings.  Responsible for all documentation i.e. Survey packs, SIL (service in Lieu design), Core ATP / Passive ATP Packs and arrange all required documents / certificate of conformance for accomplishment.

  • 2021 - 2017
    Middle East Miracle Gen Cont, Riyadh

    Project Engineer OSP

    PROJECT: SCECO OSP PROJECT  Perform Project Planning and control, Executed according to the objectives/scope and estimated resources.  Responsible for RFP\'s, individual project schedules, cost, budget tracking & reporting, and status updates.  Coordinated project and ensured compliance with estimated costs and timelines.  Providing technical support to the project team and wider regional teams.  Develop clear and concise technical proposals that support the Sales strategy and the overall business goals of the organization.  Provided technical support to sales with customer visits for pre-bid presentation conferences.  Checking sites work as per specification (Trenching Excavation, laying of power cable, Concrete and proper Asphalt).  Responsible for the completion of all documentation.  Prepare contract documentation for procurement services and materials.  Preparation of Bill of Materials, RFQ, documents and drawings, Equipment, Vendor queries and vendor finalization for projects.  Evaluating tenders and providing recommendations.  Check the quality of the site and conduct PAT/FAT for the implemented Projects.  Technical assistance in business development and meetings with new customers for enhance business.  Identifying prospective clients and then contacting them.  Termination of power cable into the cabinet and testing with tools appropriate selection and installation of circuit breakers, rectifiers and batteries.

  • 2013 - 2015
    Raed El Nagah Gen Cont, Riyadh

    OSP Engineer

    PROJECT: Mobily SNFN and CRW Metro Projects  Detailed survey for FTTX cabling and SNFN, Coordination for Permission road cutting (Baldiya Tasreeh).  Prepared and reviewed engineering specifications, scopes of work, schedules of payments and other documents.  Arranged the required Machinery (JCB, Bobcat, and Trencher etc.) and teams according to the scope.  Site surveys for OSP CRW-Metro and SNFN sites, meetings with contractor and inspection of the Contractor’s work (Trenching, Fiber optic cable laying, splicing and termination of fiber cable and Installation of Marker Posts, Hand Hole, Mini Manhole.  Proper communication with teams to execute the work efficiently.  Preparation of Red Line Drawings if need modification in the design.  Conduct PAT/FAT for the implemented Projects.  Preparation of daily progress report of OSP work and submitted to the client  Ensure that the implementation as per accordance with the design and site requirement.  Ensured quality of project deliverables meets acceptable standards.  Preparing/raising the invoices and submission to client and follow up.  Developing new business within the existing customer base.

  • 2012 - 2013
    CSE Global Transtel Pte Ltd

    Construction Engineer (Telecom)

    PROJECT: SATORP Jubail Export Refinery Project  Work permits Receiver from Saudi Aramco Company.  Detailed Survey for PA/GA field equipment as per the EPC confirmation.  Supervision in Installation and termination of PA/GA Cabinet and field devices indoor and outdoor like speakers, junction box, beacons, marshaling boxes etc., as per design standards.  Preparation of daily progress report of fiber splicing, testing and submitted to the client and also report to the Construction Manager.  Coordinate with EPCs and resolve any technical issues among design team, construction team, clients, sub-contractors, and other EPCs during the construction.  Ensure that the implementation as per accordance with design and site requirement.  Preparation of Red Line Drawings.  Perform Survey and Installation of VHF/UHF Radio Survey and Installation of Security cameras as per the design.  Positioned correctly all CCTV cameras in the site for proper recording and assured all areas in the facility is covered.  Assured that all CCTV in the facility are running in good working conditions.  Repaired CCTV cameras on site.  Proper communication with teams and discussed the site issues and rectify.

  • 2009 - 2012
    ACES Co, Sumitomo Corporation

    Transmission Engineer

    PROJECTS: STC Microwave O&M Project Mobily FTTH Project STC IBS Fiber Optic Implementation Project  Project Detail design of FTTB and survey for FTTB cabling and, supervision of fiber installation and testing using various test equipment\'s at the customer site in coordination with Mobily.  Analyzing customer requirements for generating required network according to the customer needs.  Troubleshooting/Maintenance of faults in the link at customer site.  Supervision in implementation of fiber optic cable, splicing, and end to end testing for indoor GSM Remote units in Princess Nora University KSA.  Testing fiber optic cable, temporary splicing, fusion splicing, pigtail splicing, OTDR stabilized light source, power through, end to ends and OTDR traces download to computer.  Preparation of BOQ and test results with as built drawings.  Assigned as lead engineer on O&M project for Saudi Telecom handling microwave links in a complete region.  Day to day reporting of the performance of the region to the Regional Manager of the company and Saudi Telecom Company.  Commissioning IDU for NOKIA, NEC Pasolink, Huawei RTN, Harris and PCOM.  Alignment of Microwave antenna PDH & SDH with its High & Low Band Radio with offered Polarizations & degree.  Responsible to verify site functionally and to ensure they operate accordingly and fault free within the timeframe.

  • 2008 - 2009
    ACES Co, Sumitomo Corporation

    Telecommunication Engineer

    PROJECTS: NSN CDMA Project NSN Zain Project STC Benchmarking Project  RF Survey to provide all RF details as Antenna Orientation, Height of the GSM antenna, Type of antenna, site location.  Preparing Technical Site Survey Reports (TSSR).  Installation of Node B Antennas, MHA, Node B equipment, E1 cables, feeder systems, grounding, etc.  For sites while meeting deadlines.  Experience for Integration, Commissioning and Implementation of NOKIA Flexi EDGE BTS/NOKIA Flexi WCDMA (NODE B) systems.  Handled all the issues related to Alarms, faults and the Quality at the Site.  Perform TRX expansion and BTS re-configuration, program Nokia Hopper manager database for BTS local configuration.  Coordinated with NOC for site integration and ensure that the required licenses are uploaded to the NODE B.  End to End E1 testing for sites upgraded and providing additional E1\'s for sites.  Performed the Successful PAT with the Customer.  Supervision and coordination with the sub-contractors at the site for the transmission, confirmation and clearance of all the external alarms at the site.  Prepared daily and monthly report and ensuring on time submittal to manager.  Responsible to test and verify system functionality and ensure system operates accordingly and fault free within the timeframe before handover to operator.  Plan and carry out RF drive test by using TEMS Investigator and Q-Voice.  Perform antenna system test (VSWR and DTF) - sweep test for 900/1800 MHZ antennas using Anritsu Site Master.  Undertake GSM Cell Enhancer installation, commissioning, site acquisitions and site survey for remote sites located throughout the country

Expertise

Project Management

Portfolio

Skills